Our Projects

title

HIGH PROFILE EPCC PROJECTS

Contract Date Client Description Photos
June 2021 TNB Contract No. TNB2158-2021
PMU 132/33kV IOI MAYANG (2X90MVA) AND LILO 132KV OHL FROM ABBA – NUNI INTO PMU IOI MAYANG
Project Status : - On Going
May 2021 TNB Contract No. TNB 1960/2021 Merekabentuk, Membina & Menyiapkan Pembinaan Bangunan PPU 33/11KV Zon Timur 1 Tahun 2021 Untuk TETUAN TNB BAGI MAINHEAD A : PPU Lanchang
Project Status : - On Going
March 2021 TNB Contract No. TNB 1466/2021
Supply and install of 1 X 350MVA 500/275/33kV (1-PHASE XGT) AT PMU Yong Peng East and 1 X 250MVA 500/275/33kV (1-PHASE XGT) at PMU Tanjung Bin as Strategic Spare
Project Status : - On Going
October 2020 Transgrid Ventures Sdn Bhd / TNB Cadangan Membina Bangunan Pencawang Masuk Utama (PMU) Pelangi Indah GIS 132/33KV (Erection and Fire Fighting), Daerah Johor Bahru, Johor Darul Takzim
Project Status : - Completed
January 2020 TNB Contract No. TNB 110/2020 Merekabentuk, membina dan menyiapkan pembinaaan PPU 33/11kV Di Zon Utara Pakej 3 Tahun 2019 - Mainhead B: PPU 33/11kV Batu Kurau, Perak
Project Status : - On Going
October 2019 Transgrid Ventures Sdn Bhd / TNB PMU MTRD 132/33KV MATRADE GIS (2X90MVA), KL (Erection and Fire Fighting) for TETUAN TENAGA NASIONAL BERHAD
Project Status : - Completed
October 2019 Huls Transmission Sdn Bhd / MRCB 132kV bulk supply to LRT3, 132kV switching station Glenmarie @ Persiaran Kerja Relocation and Reconfiguration of 132KV KULW-SJSS & KULW-SJTC 132kV underground power cable (OHL & PMU scope of work)
Project Status : - Completed
September 2019 Huls Transmission Sdn Bhd / TNB Contract No.: TNB3541/2019
275KV Double Circuit Overhead Line work from T-Off Bukit Batu – Yong Peng North to Batu Pahat East.
Project Status : - Completed
June 2018 TNB Contract No. : TNB 1268/2018
Mainhead B: Replacement of 132kV Primary & Ancillary Equipment & Associated Work at PMU Rantau Petronas, Terengganu.
Project Status : - Completed
June 2018 TNB Contract No. : TNB 1267/2018
Mainhead A: Replacement of 275kV Primary Equipment & Associated Work for PMU 275/132kV Port Klang, Selangor.
Project Status : - On Going
April 2018 Transgrid Ventures Sdn Bhd / EDRA Contract No. TEPC-HWMLXYJDXM-25TJDLMLX-2018-037 132kV Substation and cable electrical erection work for 50MWac PV Solar EPC Project in 132kV Kuala Ketil, Kedah.
Project Status : - Completed
June 2017 TNB Contract No. : TNB 2147/2017
Supply, Install and Commissioning of Hundred Seventy Six (176) Set Isolator to Replace Problematic Mesa Gatica Isolator at PMU Tebrau (TBRU), PMU Senai (SNAI), PMU Pagoh (PGOH), PMU Tanjung Laboh (TLBH), PMU Masjid Tanah (MTNH), PMU Bukit Kepayang (BKPY), PMU Semarak (SMRK), PMU Satria (STRA), PMU Tuanku Jaafar Industrial Park (TJID), PMU Taman Tuanku Jaafar (TTJF) & PMU Bandar Muadzam Shah (BMSH).
Project Status : - Completed
June 2017 TNB Contract No. : TNB 1899/2017
Mainhead B: Replacement of 132kV Primary and Ancillary Equipment & Installation of Anti-Theft Fencing for PMU 132/33kV Bukit Ketri, Perlis.
Project Status : - Completed
June 2017 TNB Contract No. : TNB 1898/2017
Mainhead A: Replacement of 275kV Primary Equipment & Associated Works for PMU 275/132kV Bukit Tengah, Pulau Pinang.
Project Status : - Completed
May 2017 Transgrid Ventures Sdn Bhd / KLCC (PETRONAS) Procurement, Construction, Installation, Testing & Commissioning, Completion and any other Associated Works of Proposed Pencawang Masuk Utama (PMU) No.2 at part of Lot 35, KLCC for Gas District Cooling (M) Sdn Bhd (GDCMSB) Substation: PMU KLCC2 132/33kV
Project Status : - Completed
March 2017 Jimah Energy Power (JEP) / Transgrid Ventures Sdn Bhd / TNB Primary Electrical Erection works for PMU 500/275KV OLAK LEMPIT
Project Status : - Completed
August 2016
July 2016
Transgrid Ventures Sdn Bhd / TNB Primary Electrical Erection works for PMU 500/275/132KV Bentong South.
Project Status : - Completed

Appointment as Mechanical and Electrical Sub Contractor for 500kV Bentong South Substation Building (2 Storey Building) at Pahang. Scope of works requires tabulating calculation & design & installation.
Project Status : - Completed

HIGH PROFILE CONSULTANT / PMEC PROJECTS

Contract Date Client Description
October 2018 POYRY ENERGY Sdn Bhd / Jimah East Power Jimah East Power (JEP) 2 x 1000MW Coal Fired Power Plant in Port Dickson, Negeri Sembilan, Malaysia as a sub-consultant which required to support Poyry Energy Sdn Bhd act as an Independent Engineer (IE) to witness and certify all compliance and grid code tests carried out on the Generating Block as specified in the Power Purchase Agreement (“PPA).
February 2018 POYRY ENERGY Sdn Bhd / Edra Energy Sdn Bhd Edra Energy Sdn Bhd Power Plant 50MWAC SOLAR PHOTOVOLTAIC Power Plant in Kula Ketil, Kedah as a subconsultant which required to support Poyry Energy Sdn Bhd act as an Independent Engineer(IE) to witness and certify all compliance and grid code tests carried out on the Generating Block as specified in the Power Purchase Agreement (“PPA”)
February 2018 Advisian Malaysia Sdn Bhd / Southern Power Generation Sdn Bhd Southern Power Generation Sdn Bhd Power Plant 1440MW Combined Cycle Gas Turbine Power Plant in Pasir Gudang, Johor as a sub-consultant which required to support Advisian Malaysia Sdn Bhd act as an Independent Engineer (IE) to Witness and certify all compliance and grid code tests carried out on the Generating Block as specified in the Power Purchase Agreement (“PPA”)
October 2017 Advisian Malaysia Sdn Bhd / Edra Energy Sdn Bhd Edra Energy Sdn Bhd Power Plant 2242MW Combined Cycle Gas Turbine Power Plant in Alor Gajah, Melaka as a subconsultant which required to support Advisian Malaysia Sdn Bhd act as an Independent Engineer (IE) to witness and certify all compliance and grid code tests carried out on the Generating Block as specified in the Power Purchase Agreement (“PPA”)
August 2017 TADMAX Power Sdn Bhd / TNB CCGT Power Generating Facility 1000/1200MW-Pulau Indah, Selangor, Malaysia – TADMAX. As a Sub-Consultant to Fichtner GmbH & Co. KG Branch Office Malaysia to review and commenting on 275kV & 132kV Interconnecting Facilities (IF) Designs on behalf of the Owner.
May 2017 POYRY ENERGY Sdn Bhd / PETRONAS The Pengerang Cogeneration Plant (PCP) Power Plant 1,220MW Gas fired cogeneration plant in Pengerang, Johor, Malaysia as a subconsultant which required to support Poyry Energy Sdn Bhd act as an Independent Engineer (IE) to Witness and certify all compliance and grid code tests carried out on the Generating Block as specified in the Power Purchase Agreement (“PPA”).
January 2020 POYRY ENERGY Sdn Bhd / TNB Tenaga Nasional Berhad Manjung Power Plant 1000MW Coal Fired Manjung Five Power Plant in Manjung, Perak, Malaysia as a sub-consultant which required to support Poyry Energy Sdn Bhd act as an Independent Engineer (IE) to Witness and certify all compliance and grid code tests carried out on the Generating Block as specified in the Power Purchase Agreement (“PPA”)
October 2019 Raub Energy Ventures (RE) Sdn Bhd / Malaysia Debt Ventures Berhad (MDV) Appointment as Civil, Structural, Mechanical and Electrical Consultant for 5MW RAUB BIOMASS POWER PLANT at Pahang. Scope of works which verifies that all statutory requirements with respect to construction complies by Raub Energy Ventures (RE) Sdn Bhd to Malaysia Debt Ventures Berhad (MDV) including verifying and certifying all claims as per disbursement of the financing facilities.
April 2016 G4Tec Engineering Limited, Cambodia / EDC 132kV bulk supply to LRT3, 132kV switching station Glenmarie @ Persiaran Kerja Relocation and Reconfiguration of 132KV KULW-SJSS & KULW-SJTC 132kV underground power cable (OHL & PMU scope of work)
September 2015 MOTT MACDONALD, Singapore / TNB Tenaga Nasional Berhad Prai Power Plant 1071MW 22/275kV gas-fired Combined Cycle Gas Turbine (“CCGT”) power plant in Prai, Penang, Malaysia as a sub-consultant which required to support Mott MacDonald Singapore Private Limited act as an Independent Engineer (IE) to Witness and certify all compliance and grid code tests carried out on the two Generating Blocks as specified in the Power Purchase Agreement (“PPA”)
August 2015 JIMAH Energy Ventures Sdn Bhd, Malaysia & Antara Perunding Consulting Sdn Bhd Appointed as Owner’s Engineer (Consultant), JIMAH Energy Ventures Sdn Bhd, Malaysia for JIMAH East Power 2 x 1000MW Coal Fired Power Plant Project to carry out 500kV, 275kV and 132kV overhead line & substation projects in JIMAH through a 3 years contract. Work ranges from the development stages through to commissioning, including highlevel project management, design, assurance, quality control, cost control, site supervision and management of defect liability.
July 2015 HG Power Transmission Sdn Bhd/TNB Consultant for HG Power Transmission Sdn Bhd to carry Out Engineering works for 500kV Transmission Line from Jimah-Olak Lempit for Jimah East Power (JEP)
July 2015 Singapore Power Grid & Afrima Consulting Engineer Sdn Bhd Consulting Works for SP Power Grid Ltd, Singapore. Provide technical support and guidance for review of 230/66/22kV 200MVA Power Transformer technical specifications and factory acceptance test reports to our associate company m/s Afrima Consulting Engineers Sd. Bhd. Main objectives includes: to identify any ambiguous/vague requirements in the technical specifications & providing recommendations, verify the necessary tests, test methodologies, setups, parameters & results etc., are in accordance with the contractual requirements, IEC 60076 standards, Employers standards, & to provide recommendations on the correct/expected necessary tests, test methodologies, setups, parameters & results etc., in the event of non compliance.
June 2015 Kenya Electricity Transmission Company (KETRACO), Kenya & Afrima Consulting Engineer Sdn Bhd Appointed as Owner’s Engineer (Consultant), Kenya Electricity Transmission Company (KETRACO), Kenya for KETRACO to carry out 400kV, 220kV and 132kV overhead line and substation projects in Kenya through a 2 years contract. Work ranges from the development stages through to commissioning, including high-level project management, tender evaluation, selection of sub-contractors, procurement, design assurance, quality control, cost control, site supervision and management of defect liability.